Stocksigma LogoStocksigma Logo

Juniper Green Fully Commissions 75 MW Hybrid Project with Tata Power PPA

Juniper Green Energy Limited's wholly owned subsidiary, Juniper Green Beam Eight Private Limited, has fully commissioned its 75 MW Wind-Solar Hybrid Power

Juniper Green Fully Commissions 75 MW Hybrid Project with Tata Power PPA

Juniper Green Energy Ltd 路 Others (Uncategorized) 路 18 Sept 2026, 3:44 am

Juniper Green Fully Commissions 75 MW Hybrid Project with Tata Power PPA Juniper Green Energy Limited's wholly owned subsidiary, Juniper Green Beam Eight Private Limited, has fully commissioned its 75 MW Wind-Solar Hybrid Power Project under a Power Purchase Agreement with The Tata Power Company Limited, following the commissioning of the final 25 MW solar component on 17th Sep'26. Consequently, the group's aggregate operational capacity reached ~2,725 MWp alongside ~500 MWh of Battery Energy Storage Systems (BESS).

Original exchange filing (PDF)

More announcements from Juniper Green Energy Ltd

All Juniper Green Energy Ltd announcements