Stocksigma LogoStocksigma Logo

Kinetic Engineering Approves Revised Fund Utilization Plan for Warrant Issue

Kinetic Engineering Limited’s board approved a revised fund utilization plan for its warrant issue on 13th Nov'26, reducing total planned deployment from

Kinetic Engineering Approves Revised Fund Utilization Plan for Warrant Issue

Kinetic Engineering Ltd · Others (Uncategorized) · 13 Nov 2026, 7:36 pm

Kinetic Engineering Approves Revised Fund Utilization Plan for Warrant Issue Kinetic Engineering Limited’s board approved a revised fund utilization plan for its warrant issue on 13th Nov'26, reducing total planned deployment from ₹166.84 cr to ₹158.68 cr. Investment in its subsidiary company was trimmed from ₹120.00 cr to ₹104.00 cr, and capex (including solar project) was lowered from ₹7.00 cr to ₹5.00 cr. Conversely, working capital allocation increased to ₹20.00 cr (from ₹13.54 cr) and general corporate purposes rose to ₹5.22 cr (from ₹1.84 cr). Preference share redemption (₹19.64 cr) and overdue liabilities (₹4.82 cr) remain unchanged.

Original exchange filing (PDF)

More announcements from Kinetic Engineering Ltd

All Kinetic Engineering Ltd announcements