Stocksigma LogoStocksigma Logo

Bondada Engineering Accepts LOI for GIPCL's 20 MW/120 MWh BESS Project

Bondada Engineering Limited accepted a Letter of Intent (LoI) on 17th Oct'26 from Gujarat Industries Power Company Ltd

Bondada Engineering Accepts LOI for GIPCL's 20 MW/120 MWh BESS Project

Gujarat Industries Power Company Ltd 路 Others (Uncategorized) 路 17 Oct 2026, 8:36 pm

Bondada Engineering Accepts LOI for GIPCL's 20 MW/120 MWh BESS Project Bondada Engineering Limited accepted a Letter of Intent (LoI) on 17th Oct'26 from Gujarat Industries Power Company Ltd. (GIPCL) following approval from GUVNL. The contract covers the EPC鈥攊ncluding design, engineering, procurement, supply, civil works, erection, testing, and commissioning鈥攁nd 10-year operation and maintenance (O&M) of a 20 MW/120 MWh Battery Energy Storage System (BESS) at GIPCL鈥檚 132 kV substation. All other terms from the initial 11th Aug'26 intimation remain unchanged.

Original exchange filing (PDF)

More announcements from Gujarat Industries Power Company Ltd

All Gujarat Industries Power Company Ltd announcements